Tuesday, September 28, 2010

Day 15: engineering bricks

Engineering bricks take the wall up to slab level today. Forecast is heavy rain tomorrow so the slab will be done on day 17 assuming the building control have no objections.

1 comment:

  1. Nice post. Thanks for sharing.
    when simplest the satisfactory screw will do. when and in which to save on piling costs with screw piles.
    We provide services of Besment waterproofing, concrete repair, footings, subsidence, basement underpin articles, basement walls, retaining walls, shoring, spray concrete, underpinning, grout injection, house underpinning(sydney), underpinning services, foundation repairs, basement garages, house restumping and ventilation sub-floor.helical pile